M-4 Faisalabad-Multan Motorway

faisalabad-multan-motorway

Prime Minister of Pakistan  perform the inauguration  of the first phase of M-4 (Faisalabad-Multan Motorway) on Wednesday August 19′ 2009. First phase of M-4 is, 54 kilometers from Faisalabad to Gojra the remaining three phases are,  Gojra to Shorkot, Shorkot-Khanewal, and Khanewal to Multan,  and it will be completed in three years. Construction work would be started simultaneously. The expected cost of M-4 project is around Rs.40 billion.

The completion of Faisalabad-Multan Motorway (M-4) will provide a short access to Multan and other big cities. This will be a four-lane motorway with a six lane structure, which can be converted to six lane whenever needed. The total length of the Faisalabad-Multan Motorway is 233 kilometers which has been divided into four sections of Faisalabad- Gojra section (58 kilometers), Gojra-Shorkot section (61 kilometers), Shorkot-Din Pur-Khanewal section (65 kilometers), and Khanewal-Multan section (65 kilometers), whereas, two large bridges will be constructed on River Ravi and Shadhnai Channel.

About these ads

About iampakistan
I am a Blogger, Entrepreneur, Network Guru, Web Architect

97 Responses to M-4 Faisalabad-Multan Motorway

  1. Muhammad Ali Johar says:

    It is a great decision by PRIME MINISTER GILLANI to make the Motor Way for NULTAN.
    Please also mention name of company to whom contract is given.
    It is also better to make M4 in phases.
    Secially Thanx to Prime Minister Yousuf Raza Gillani.

  2. MUHAMMAD JUNAID says:

    Dear Sir.Madam

    I am joining motorway jobs because i have experience in this filed in two years. I will wait to your answer.

    REGARDS

    M.Junaid

  3. Jawad Khan says:

    Its too late start!!.. It should have started long time ago.. In Nawaz Sharif times motorway project was initiated and very quickly it was being implemented. Whole country would have been connected with motorways if Nawaz Sharif could have stayed longer. Motorways and highways are basic infrastructure required for progress of the country. PPP as always is just busy in looting and doing nothing else.

  4. asif says:

    this project should have started earlier in 2003-04.joining the heartlands of industrial hubs of pak M-4 links multan faisalabad, and provides the short distance for the people of multan khanewal toba tek singh, and faislalabad district and divisions as well.shortcut for sindh and lower punjab district to reach capital terrirtory of pak. morover providing job opportunities to peoples from these areas beside industrial development. good luck M-4 and pakistan. this chain of motorways should not be stopped it should reach at earliest from peshawar to karachi

  5. Saeed says:

    Any update when this project will start. After inauguration in Aug, 2009 I haven’t heard anything.

  6. husnain shigri says:

    Salam. it is a good to link Multan with Islamabad through Motorway But govt should built dames first to generate electricity and for irrigation of oyr useful land otherwise all these projects will be worthless. Thanks and ALLHA HAFIZ.

  7. Muhammad Asif Shahzad says:

    Hi i m Muhammad Asif Shahzad
    PA to Project Director (Motorway M-4)
    It is great Project
    All staff of this project is very very hardworking
    Plz pray for us to complete this project
    thanks

  8. Ali shahbaz says:

    Dear Asif shahzad
    Can you please tell us whats the work progress on the project as of now and when it would be completed

    Thanks

  9. M Jawad Khalid says:

    Dear sir,I am fresh DAE Civil +AutoCad 2D&3D.I wants to get internship and start my carier to Motorway Construction.My village is nearest to Motorway Fsd to Multan.Sir I wants to learn how to in field.Plz help me

  10. M Jawad Khalid says:

    Where Can I apply as a Fresh DAE Civil

  11. Dear All Brothers,

    i am a normal Patriot Pakistani Citizen just wanted to know what is happening right now is the Multan Faislabad motorway being built or just news and papers like mostly happens with us.

  12. Imran Raza Shorkot city says:

    It is a great decision by PRIME MINISTER GILLANI to make the Motor Way for FAISALABAD TO MULTAN
    Can you please tell us whats the work progress on the project as of now and when it would be completed

    Thanks

    Secially Thanks to Prime Minister Yousuf Raza Gillani.

  13. Maddsar Ghafoor says:

    Salam to all,
    I think Motorway M-4 work is started. I am see this site some people whown on this site work he like on chaine i think this project complete any chanies company

  14. DEAR MR. ASIF SHAHZAD ! 19,MAY 2010
    ASU!
    MY DEAR MAY I KNOW WHEN WILL THE PROJECT COMPLETE?
    MORE I WANT TO KNOW WHETHER THE WORK IN PROGRESS & WHERE?
    PLS. IF YOU TELL ME WAHT IS THE DISTANCE FROM FAISALABAD TO DEENPUR ENTER-CHANGE?
    GOOD WISHES FOR THE EVERY SINGLE PERSON WHO IS ATTACHED WITH THIS DREAMFULL PROJECT. GOD BLESS THEM.

  15. Faisal Nazir says:

    Dear All,
    I am from Faisalabad and near the initial stage (starting point) of M4. Very honestly 10 months has passed to inauguration but nothig in paractical. Acctually 1st pahse of M4 (Fsd~Gojra) should be near to finalize but nothing is in paractical work. I think it was a project to get the commision which they got.

  16. ABDUL RASHID says:

    THE PROJECT IS LAUNCHED BY THE PM IS A GREAT PROJECT AND SHOULD BE COMOPLED AS EARLY AS POSSIBLE. BUT STILL IS NOT ANY PRACTICAL WORK STARTED. IT IS MY GREAT AND HUMBLE REQUEST TO COMPLET THE M4 WITHIN 2 YEAR AS WORKED IN OTHER COUNTRIRS.

  17. Aamer Javed says:

    I am B-Tech (Hons) in Civil Technology and have 10year experience of Civil Construction work mostly Hydraluc Structure ( Fall/Bridges) and want to work on this mega project of M-4 Faisalabad Multan motorway.
    I offer my services for any Consultant firm that are working on M-4
    OBJECTIVE:
    Looking for a challenging job that requires the optimal use of my talent and interpersonal skills.

  18. Muhammad azam.job electork says:

    i m very god man

  19. Muhammad Jawad Khalid says:

    at first section is CWE and which companies are working at other two section.what can Any person inform me?

  20. Muhammad Umer Munir says:

    Please can any body tell me when this project complete?

    Please any can tell?

  21. Irfan Jamil, Gojra says:

    I am from gojra and i like motway and most like gojra secsion.

  22. Khuraam Shahzad Gojra says:

    Hi,
    I heard about the motorway M4. This is really a great project that will help my city to groom economicaly and also use ful for people who are suffering by poverty. No doubt it is a great project.

  23. Mirza Irfan Jamil Gojra says:

    I am so found of the construction of motorway that i daily visit the site of motorway Gojra section. A am anxiouly wating of completion of this Ssection so that i could travel on it from my own city. May ALLAH help them.

  24. Hassan Zia Cheema says:

    Assalam O Aliakum.Today i went to Gojra Interchange(M4)which is underconstruction and i saw that the construction of m4 is not going on fast as it have to be.So i request you to construct it as fast as you can because the route from Faisalabad to Gojra is very insecure (robery and accidents are at high trend).So it had better to construct it as fast as you can…

    I WANT TO ASK THAT IF HALF OF THE M4 WILL COMPLETE OR ITS 1ST INTERCHANGE WILL COMPLETE THEN WILL YOU ALLOW PEOPLE TO TRAVEL FROM THERE , OR THEY HAVE TO CHOOSE THE PREVIOUS WAY?

  25. i am Muhammad Haris& We HARIS ENGINEERING SERVICES FAISALABAD would like to introduce our self as one of the leading Importer & Stokist of surveying Instruments, Construction Machinery ( LIGHT & HEAVY) ang Laboratory testing Equipments and we also repair surveying instruments. Please call for any inquary about this Motorway project.
    0322-5121168

  26. Naseeruddin Qureshi says:

    It always better later than never.
    Good Luck and Best Wishes to Pakistan

  27. Mohammad Saeed Goraya says:

    Salaam, Glad to know that M4 Motorway is under construction. Concerning the payments and the acquisition of the land-, please don’t be upset because the construction will not take place until they make payment to the land owners. The authorities already have completed their survey, and it seems like the rate of the land is established based on their formulas.
    What I have heard that there are people out there claiming that they can get the farmers more money than the rate established by the authorities. Please don’t fall into those people traps. If you are one of the landowners or farmer whose land will be part of this project, please discourage these people. I have heard people are giving 10% or fixed amount per acre to get the good land price or to expedite the payment process. The reason I know is that I have some relatives that actually paid money under the table to “Patwari” & “Tahsil Daar” in Toba to get an expidiate payments. Since I have some land that comes in this project they suggested me to do the same. As a muslim & pakistani I am reluctant to pay bribe. After little research I did obtain some info that the authorities will not start construction until they make payment to the land owner whose land is part of the Project. So if your land is part of this Project please dont worry about the payment process, it will be safe, secure and it will be transparent.
    Also I heard that the Interchange of the M4 will be in Chak no. 303 (Khatore) which is on the right side of the Jhang Rd when coming from Gojra.
    Furthermore, if someone knows more information regarding the whole process, please share it online.

  28. Irfan Jamil. Gojra says:

    I am waiting for Driving on M4 Motorway. Inshallah

  29. shafqat saleem says:

    Please comfirm me about how much construction work is completed up till now of this project???

  30. Noman says:

    Nothing construction is being processed and not excpected with in next three years

  31. arif says:

    aoa
    i want to know..when ground work wil start on m-4.
    or if it has already been started???

  32. umair says:

    Plz tell me about comPleation of M4….. i m very excited about M4….

  33. imran Ali says:

    i am Lab technician civil. i want to know costruction companies. because i want to join it as a lab Technician

  34. Muhammad Haris says:

    my dear brother if yo want to do work in this project as an engineer , Lab technician civil or surveyor. just contact me 0322-5121168

  35. NASEERUUAL says:

    Please intimate landowner where the motorway will be made to claim for payment of land. The claim will be free of charges and immediately on deposit of application proforma.

  36. Naseerullah says:

    please intimate the where the application form will be available in Website of national highway authority/motorway. Is it free of cost provided to land owner in Motoway.

  37. tariq ali says:

    How many Interchanges will link the city of Jhang??? and how far??? if anyone can help me in the matter kindly.

  38. Muhammad Asif says:

    Please some one tell me about Status of M4 Motorway Project. when it will completed

  39. Saeed Mohammad Goraya says:

    A.O.A: If anyone has gone through the Land Accusation Process please help the landowners by highlighting the requirements and documentations they need to establish their ownership. If any N.H.A or any official Motorway representative reading this comment I would request him to help all landowners by publishing the basic information or direct us to the official web link that has the application and relative details needed to claim the money. By putting this information you may helping the poor landowners in the rural areas from money hungry wolves out there who are promising the poor landowners to get more value on the land if they pay certain amount to them . Which I am sure it is not the case, all the rates are predetermined and these middle men cannot do anything to exaggerate the price. Any contribution you make will impact landowners and this information will be considered a great resource to anyone who is searching the information online.

  40. abdul maalik says:

    any one who can tell me about the status of M4, is it possibe that it may conplete in this governent. Or the public will be depending on the willing of next govt.
    YA ALLAH PAKISTAN KO TARAQI DAY.
    KASH MAIN WO DIN BHI DAIKHO K JAB MOTORWAY KARACHI OR GAWADAR KO TOUCH KARAIN OR LOG KARACHI SAY ISLAMABAD 16 HRS MAIN TRAVEL KARAIN

  41. aleem ali shah says:

    greate work pm aur bhoot work in multan bhoot allha prime manister……..

  42. Muhammad sufyan says:

    plz tell me about jobs in motorway police.i want to join motor way police

  43. Kaleem Ahmad says:

    Dear All,

    Can any one let us know the current status of the constrcution work on M4, How much is completed and when this project (Faisalabad – Multan) will be completed? Is there any web site through which we can get this information?

    Keep Happy

  44. Dear Guys,

    8 sub contracters are now working under CWE and 20% construction is almost completed.
    If any Syrveyor want to join this Project please ask us freely,
    Muhammad Haris
    0322-5121168

  45. Farhan Yusha says:

    Haris when will the construction work start between khanewal-Multan section.?

  46. Abdullah khan says:

    its a very nice decision by prime minister and will be very useful to the people but the problem is this that it hasnt been started yet ,,,,,,,,!!
    :P :D

  47. Farhan Yusha says:

    What is the future of multan-khanewal section of M-4?

    Anyone?

  48. Mohammad Jawad Khalid says:

    20 PERCENT WORK IS NOT COMPLETE.What is your position in CWE.How can you help surveyers.can You contact me at 03324455516.I am first man which joined CWE at M4. Much persons(Surveyers) are waiting your responce

  49. you can contact to Khalid Rauf Construction Company.this company will construct a part Multan to Khanewal

  50. altaf says:

    when will m4 be likely to be completed

  51. malik javaid says:

    Aslam O Elaicum I frequent traveler from karachi to faisalabad on my own car. I am strongly waiting for it to complete… any body have any update about its completion.
    Long Live Pakistan ..
    Pakistan zindabad

  52. aamer says:

    what is the status of road is there any work on ground or is it just verbosity

  53. shaukat says:

    Could you tell me “what is the official page of CWE?”

  54. zulfiqar says:

    Multan – khanewal motorway section M-4 is not fair alignment. powerful people change the direction of M-4 . Now M-4 is not passing through their agriculture land. I you see the map then u will know whats going on.

  55. I am D.A.E civil. I want to do work in this project as an supervisor and surveyor from SHORKOT. Contact no 0323-5559099

  56. adeel says:

    hi i am adeel i am very happy for ths project was complete i love cwe company becoz the cwe staff was very great specially some one special she nows me…..

  57. adeel says:

    very spl company and staff

  58. ahmad says:

    chines are cheating us not working properly

  59. adeel says:

    ahmad y u say chinies cheating us….chinies r very great person for us

  60. adeels duplicate says:

    hy everyone i have been the part of this project nice spent time and lot of work… i know oneday we will travel on this motorway…and do not appreciate chinese so much they are very slow workers…but hardwoking….thanks to them they are workng in pakinstan but plz tell me donot overtake pakistan and donot ever under estimate pakstanis….gud luck nation be hard workers learn from chinese

  61. DEAR
    SIR when it is completed now………………………..?

  62. DEAR
    sir please tell how many INTERCHANGES IN THIS ALINGMENT AND WHERE PLEASE TELL ME ITS NAME…………………………..

  63. Ali says:

    Please tell me. the current status of that project. when it will began

  64. khawaja fraz says:

    my name khawaja fraz and iam work in m4 project i job in cwe compani and this project in very good for pakistani nation

  65. fhdsok says:

    khawaja fraz sb. if u work for cwe in M4 project, then plz provide us with information about the progress of this project and to upload some pictures of construction work. we will be very thankful to u.
    regards

  66. ismail says:

    good information provided. just keep maintain and carry on.

  67. emme says:

    any one tell us how work status on this project is or ist phase near to complete and then we can travell on it thnks

  68. Aizaz Haider says:

    The work is in progress. NesPak is consultant while NHA is contractor. I with my class mates are going there for internship.

  69. abi says:

    motor ways are good but in azad kashmir roads are finishd they need new good roads like motor way and like N5 can pakistan will do and NHA will take over azad kashmir mirpur . they will put toll plazaz and make azaz kashmir nice..

  70. Aizaz says:

    Sorry, NESPAK was only design consultant. Renaldet SA is supervising consultant, NHA is client and CEW is contractor.

  71. You can definitely see your expertise within the paintings you write. The world hopes for more passionate writers such as you who are not afraid to say how they believe. All the time go after your heart.

  72. Anwaar says:

    Hope it will complete in 2016…

  73. Azhar iqbal says:

    I need a job of surveyor in project of motor way.i have a experience of 5 years in this field in structure work and road work.

  74. Ali says:

    Wat is for azad Kashmir no roads no toll plazas y y y

  75. i love my pakistan very much

  76. ali says:

    can NHA AND NLC make good roads in azad kashmir and put toll plazas on big roads in azad kashmir and make pepl happy plz? bcz we love pakistan make azad kashmir nice?

  77. Babar Mahmood says:

    Hi dear I m Babar. I am a frequent traveler between Multan and Faisalabad. Can any body tell me exact status of construction of this mega project? I shall be grateful.

  78. when is NHA purchasing lands in area of Shortko to Khanewal and whats an average price declared by them for an acre agri land?

  79. Guys, Can you tell me when NHA going to acquire land from Shorkot to Deen put near Abdul Hakim areas?
    What is last date they announced to lodge lands claims?

    Be submitted humbly that our Textile Mills , commercial and agree lands fall in the course of M.4 Motorway from Faisalabad to
    Multan and exact location is just one kilometer from River Ravi near Abdul Hakim city where Interchange is designed too.

    I have few questions inviting your attention/guidance.

    What are you going to finally acquire all lands in the project until Multan or Khanewal ?

    What compensation NHA paying with standard formula for:
    Factories Land + Business loss+machinery loss ?
    Loss of business ( for what period). Stoppage of production, losing customers,losing running profits ?
    Commercial Lands
    Residence Land / Sakni
    Agree lands with Rice,wheat or sugarcane
    Agree lands with farms of mango, oranges, dates
    If owners allowed to take away bricks and iron materials after those buildings bulldoze by NHA ?
    How do you pay for lands pludged with bank ?
    How do you pay for lands disputed in courts ?
    How long you pay before taking possession ?
    How to you pay to many owners in same Khaiwat ? if lands are not color filled ?
    Do you pay all money in advance or in segments some befoe and some after possession ?
    What is your formula cost to pay for houses with Kacchi bricks, Awwal Bricks, Doyam Bricks , with Guarader/T.R or with Lunter ?
    Cemented or uncemented.
    Painted or unpaited ?

    Thanks to help

    Sincerely Yours,

    Mehr Liaqat Jalvi

    Cell +92 300 8496585
    CEO of Sherry / Liaqu Textile Mills
    Storyline Magazine — (V.P PTI) Khanewal
    http://www.sherryweavers.com

    https://www.facebook.com/Sherrytexmills

    ceo@sherryweavers.com Skype: Liaquat69

  80. Hameed says:

    hi i am hameed and i do work in CWE as a Office Assistant .INSHAALLAH M4 will compelet very soon .Pakistan Zinda Baad .all the best CWE

  81. altaf says:

    can anyone tell me how much more work is needed to complete m4?

  82. usman sir says:

    where will b d service areas on m4?

  83. kashif says:

    any one can tell that how much project is completed

  84. kashif says:

    when m4 will complete ?

  85. Pingback: M 4 FSLD to KHWL Updates - 205082

  86. Kaleem Ahmad says:

    Hey guys, can any one update about the construction work of M4.

  87. Muhammad Naeem Azam says:

    Muhammad Naeem Azam
    Admin Officer CWE M-4 Motorway

    i want to share my views about M-4 construction that it will complete about june-2014 INSHALLAH. i wish all the best for my sweet Pakistan to grow for ever.

  88. Kaleem Ahmad says:

    Dear Mr. Naeem, Thanks for sharing the info & hope for the best.

  89. Abdul Hafeez says:

    The pace of work on M-4 is very slow. It was started by the previous government and according to their plan, should had finished until 19 August 2012. Until now, the first phase has yet to complete. The current government should take interest to complete it as soon as possible. This will ease the transportation from one city to another city.

  90. Marcio Jose Sanchez / APFans try to catch a
    bat that Arizona Diamondbacks’ Cody Ross lost on his swing during the first half of today’s Bell
    Helicopter Armed Forces Bowl in Fort Worth. Not only could your computer be ruined by these calamities, but all your
    storage devices and so too does your operating system and
    programs are restored.

  91. Computer hard drives store 500 times the data stored in this way might appear as if has been placed and stored on the local
    device. At the same time, you can always restore the contacts
    instantly. Once owning it, you would online backup reviews your entire registry to your desired
    location. Thus it gives you an idea of how their system works, which
    is not in good shape. Most consumers looking to purchase more storage space!

  92. Usama says:

    what is the current status of the faisalabad multan motorway
    has it been completed till toba or gojra? if not when it will be completed till there and when it will be opened for genral public. Any rough time frame?

  93. Ishaq says:

    Muhammad Naeem Azam;
    June has past and now it is july. Any new rough ideia of completion of M4.

  94. ali says:

    i am 13 years old and i live in rahim yar khan. we travel to rawalpindi and we reach there in 133 hours. i am very excited to hear about this project so that we can reach there in 10 hours. plz tell me how much it has been constructed uptil now and where we can get this information?

  95. ali says:

    sorry =13 hours

  96. iftikhar says:

    hi alio salam u alikum ,gojra to faisalabad M4 nearabout completed and will be open for public officially in dec 2014 INSHALLAH,this inormationn i get from net sourcesok iftikhar

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 154 other followers

%d bloggers like this: